Design of unloading Jetty for Oil Berth at Ennore Port
Client: Project Details Assignment
Chennai (Ennore) Port Trust / ITD Cementation India Ltd. The project comprises of  1300m long approach, 80m long vehicular approach and 425m long and 20m wide Main jetty

The responsibilities includes of preparation of design calculation and drawings of 1300m long approach trestle for pipe line supported on 1000mm diameter piles and comprising of 20m long precast prestressed superstructure girders, 80m long Vehicular approach from North Break water supported on 1100mm diameter bored cast-in-situ piles and 425m long x 20m wide Main jetty structure supported on 1200mm diameter vertical bored cast-in-situ piles for berthing and mooring of wide range of vessels of 6000 DWT to 200000 DWT capacity. The Finished Deck level is at (+)5.000m and the design  dredged level for  Main Jetty  is at  (-)21.000m.