12 X 92  m span Rail Bridge over river Krishna
Client: Project Details Assignment
South Central Railway / M/s BBJ Construction Co. Ltd. Construction of single track 92.0 m span “Through type” Structural steel Railway Bridge to suit “MBG” loading. Each span weighs about 345 ton Preparation of preliminary design, preliminary cost estimate followed by preparation of detail design, Stress sheet, Joint design, detail fabrication drawing, erection scheme, including erection stress calculation and final cost estimate.