Extension of Wet Basin including Construction of Integrated Dry Dock | ||
Client: | Project Details | Assignment |
Paradip Port Trust /Simplex Concrete Piles (India) Lid. |
The project comprises of 215m long and 12.375m wide Extension of Wet basin and 75m length x 15.3m wide Dry dock | The responsibility includes preparation of detailed design and drawings of 750mm thk. Diaphragm wall tied back with 2000mm X 750mm rectangular panel pile for wet basin floor slab of Dry dock supported on 243 nos 600mm dia tension pile, Pump House and Ancillary structures for Integrated Dry Dock. |