Ultadanga Flyover Connecting V.I.P. Road & E.M.Bypass.

Client: Project Details Assignment
Mackintosh Burn Limited Project comprises 10 Nos. (5 Nos dual carriageway) 40m spans (typical) Superstructures each comprising 2 Nos. Steel Longitudinal Box Girders connected with End & Intermediate Cross Girders & other connecting members of M.S. Structures.

Preparation of detailed fabrication drawings along with Materials & Fasteners list.